Gas Plant – Kampung Baru Booster Compressor Yard

Energy Equity Epic (Sengkang) Pty. Ltd ("EEES") will install 2 (two) units booster compressors to maintain pressure 390-415 psig in delivery point of sales gas. To running this project, EEES has award PT Slipform Indonesia to perform Engineering, Procurement, Construction, and Installation works.







We provide services for the following works:
• Site preparation and civil works which include mobilization, general site work, foundations, buildings, structures, roadway and drainage.
• Mechanical works which include erection, installation, assembly and completions 2 unit booster compressor, discharge scrubber, piping and valve, fire protection and detection.
• Electrical and instruments and control systems works which include cables terminations and connections, power outlets, earth grid, lightning protection, fire protection and detection, field instrument.
• Start up and commissioning tests.